JT Thorpe International (JTTI) was called in to Redbank Power to inspect and was then given a Turnkey project to redesign and install refractory in two failing fluid bed boilers. JTTI performed this project on-time, on-schedule and ahead of budget resulting in a performance reward to JTTI for an exceptional job done.
The plant has now far exceeded the performance of the original construction and we have a very happy customer!
PROJECT DETAILS
Schedule
On Time
Location
Singleton, Australia
Customer
Redbank Power
Scope
Turnkey Solution
Turnkey Solution
Value
Energy
Manhours
NA